Skip to content

Factory film and production process

How approved CAD data becomes production-ready cabinet furniture

The film on this page was shot in the Kika Mobel factory in Tetovo and shows board and decor samples, panels running through edge banding and CNC machining, and assembled cabinets with doors and lift-up fronts. Below the film, the page traces the controlled data handover through CAD-to-production preparation, cutting, CNC machining, edge processing, inspection, packaging, and project handover.

Factory process video

Short film without narration from the Kika Mobel factory in Tetovo, North Macedonia: board and decor samples, panels running through edge banding and CNC machining, and assembled cabinets with doors and lift-up fronts.

Built for these buyers

  • ✓Buyers evaluating the production sequence before an enquiry
  • ✓Technical teams preparing CAD, bills of materials, and hardware data
  • ✓Brands, retailers, and project companies aligning approval and handover gates

Manufacturing scope

  • 01Technical enquiry and completeness review of the data package
  • 02Production preparation through a CAD-to-production workflow
  • 03Panel cutting from approved part data
  • 04CNC drilling and routing to the approved specification
  • 05Edge processing using the project-approved edge and process

What the technical review covers

01

Station 1: data package and approval

The process begins with drawings, bills of materials, variants, materials, edges, hardware, and quantities. Missing or contradictory inputs are resolved before approval, and only one controlled revision may become the production reference.

02

Station 2: cutting, CNC machining, and edge processing

CAD-to-production preparation is followed by the approved sequence of panel cutting, CNC drilling and routing, and edge processing required for the specification.

03

Station 3: defined inspection and handover

Agreed dimensions, visual references, hardware functions, part identification, packaging, and delivery form are checked against the project scope. Flat-pack or assembled supply and EXW or another delivery option remain project-specific decisions.

Factory process

From technical file to manufacturing order

Every project starts with a technical review. Product scope, revision status, specification, and commercial responsibilities are clarified before manufacturing approval.

  1. 01

    Define the enquiry

    Buyer type, product family, variants, quantities, target market, and intended delivery form establish the initial project frame.

  2. 02

    Review the technical package

    Drawings, dimensions, bills of materials, decors, edges, and hardware are checked for completeness and manufacturing feasibility.

  3. 03

    Approve the specification

    Materials, finishes, hardware, construction details, and agreed inspection points are recorded against one controlled revision.

  4. 04

    Prepare and manufacture

    A CAD-to-production workflow supports preparation; cutting, CNC machining, and edge processing follow the approved data.

  5. 05

    Define the handover

    Packaging, labelling, flat-pack or assembled form, and EXW or another agreed delivery option are set for the specific project.

What supports a reliable feasibility review

A complete technical package makes the manufacturing and commercial assessment clearer.

  • ✓ Dimensioned drawings or CAD/PDF files
  • ✓ Bill of materials and quantities by variant
  • ✓ Material, decor, edge, and thickness requirements
  • ✓ Hardware list and functional requirements
  • ✓ Required packaging, labelling, and delivery form
  • ✓ Target market, delivery country, and requested date

Frequently asked questions

What does the factory video show?+

It was filmed in the Kika Mobel factory in Tetovo and shows board and decor samples, panels running through edge banding and CNC machining, and assembled cabinets with doors and lift-up fronts. The film has no narration or sound.

Which operations are covered by the documented process?+

The documented process covers data preparation, panel cutting, CNC drilling and routing, edge processing, inspection, packaging, and handover.

Does the video replace a technical review?+

No. The film shows the factory and its operations. Feasibility, price, and timing are reviewed from your drawings, bills of materials, quantities, materials, edge data, hardware, and delivery requirements.

Map your product data to this production process

Send the current controlled files, quantities, specification, inspection needs, and delivery form so the required operations and clarifications can be reviewed.

Send data for technical review
W